Contents
- 1 ICI Sourcing Release Notes
- 2 ICI Risk Management Release Notes
- 2.1 Overview of Risk Management
- 2.2 The Challenge
- 2.3 The Solution
- 2.4 The Capabilities
- 2.5 The Benefits
- 2.6 The Risk Management Process
- 2.7 Configuring the Risk Management App
- 2.8 Navigating the Risk Management App
- 2.9 Working with Risk Assessment Contract Type
- 2.10 Working with Risk Area Associations Contract Type
- 2.11 Frequently Asked Questions
- 3 Glossary
- 4 Technical Requirements for Release 7.12
ICI Sourcing Release Notes
Overview of Sourcing Release
The 7.12 Release introduces significant enhancements to the Icertis Contract Intelligence (ICI) Sourcing Business Application. It strives to improve user experience and usability by further improving the platform functionalities and the user interface.The key enhancements of this release include:
- Workflow Enhancements
- Revamping the workflow entities to be able to improve usability and support the flexibility required in sourcing events.
- Providing buyers the capability to copy RFx, copy associations, and link the copied RFx to the original one, thereby considerably reducing timelines to create a similar RFx and also avoiding duplication of efforts.
- Allowing modification of RFx (adding, removing or editing parts of the RFx) which is in Approved or later status until the awarding is initiated, making it easier for buyers to make changes as all the required business criteria may not be available at a glance during RFx creation.
- Evaluating suppliers for an RFx by conducting a review, scoring suppliers on their capabilities to help in the awarding process, as well as providing feedback on their bid submissions.
- User Experience and Functional Enhancements
- New multi-currency functionality to allow leveraging exchange rate variations in bids.
- Conduct price discoveries against existing contracts.
- Improving supplier contact management
- Retaining the original folder structure and file names on download and upload actions by the user
- Providing the flexibility to use alternate masterdata for supplier and supplier contacts in place of seeded master data
- Giving visibility of supplier bidding actions to buyers throughout the RFx lifecycle
- More flexible and easier bid analysis using excel
- Adding new type of bulk associations to the RFx to be able to handle large volume of item data in sourcing events
- Allowing buyers more flexibility in managing timelines of sourcing events
- Adding validations in prerequisite and mandatory contracts for shortlisted suppliers as well as linked agreements
- Enhancements to Reports
- Introducing the RFx Change History Report which provides a consolidated view to the procurement team of all actions for an entity for auditing purposes
- Enhancing the RFx Summary Report and RFx Details Report to provide visibility of data for RFx with various categorization to top management for making more informed decisions
These release notes provide an overview of the enhancements to ICI Experience for Sourcing.
- Refer to the detailed Wiki documentation for the explanation and capabilities of these and all other ICI features and functionalities.
- Please refer to the Frequently Asked Questions for details specific to the Sourcing Application.
- Partners can access this documentation here.
Enhancements to Sourcing Entities Workflow
573430 – Sourcing entities workflow revamp
With this release, the workflow for Sourcing has been revamped, in order to support the flexibility that is required in designing different types of sourcing processes and to make it more scalable. Enhancements have been made to the workflows of each of the entities – RFx, Round, Bid and Awarding as shown below:
RFX workflow
590362– 'Supplier bid status visibility to buyers throughout the RFx lifecycle
Previously, visibility of bids was controlled at the entire bid level only. However, it was not possible to know whether the supplier had submitted the bid (in case of open RFx), or if the supplier had submitted or declined it until the round was closed (in case of sealed envelope).
With this release, buyers can now view the status of bids for each supplier, regardless of the round status for a supplier who may or may not have submitted the bid. Hence, the bid count on the left navigation pane is the same as the number of bids displayed is the grid providing accurate visibility to the buyer of the current supplier status instead of having to wait for the bid to be submitted.
572078–Availability of bid analysis attributes and values in Excel for bid analysis
With this release, the bid analysis downloaded file will contain all the bids, for all the suppliers, for all the rounds, with currency information and analysis attributes with their values, in a single Excel Workbook.
All bid analysis attributes are defined in the masterdata. Users can add the bid analysis attribute from masterdata for all items in RFx. This helps the buyer to get all the information in the Excel sheet to be able to easily analyze a bid for each supplier.
Buyers can now:
- Download bid analysis excel at the bid and round levels. When bid analysis is performed at bid level, the downloaded bid analysis Excel will include the responses for a specific supplier whose bid was chosen. However, when bid analysis is performed at round level, the downloaded bid analysis Excel will include the bid responses data for all the suppliers present in the round.
- Enter the values for bid analysis attributes and upload the bid analysis Excel sheet. The value of bid analysis attributes will be updated in the bid response.
Note: Minimum one round has to be completed for any bid analysis.
Copy RFx Workflow
560481– Ability to copy RFx, copy associations and link it to original RFx
Procurement teams often use the same template, line items, questions and attachments for repetitive procurement of similar category items. Previously, as RFx/ RFI could not be copied, buyers had to create multiple sourcing events manually with different suppliers several times using the same line items, questions, attachments, and so on.
Buyers now have the capability to copy the RFx which helps reduce the timelines and avoids duplication of efforts for similar RFx creation. Additionally, as procurement involves globally distributed buyers’ team, they clone the sourcing event at the regional level and link them to one another. Linking the copied RFx to the original RFx can be achieved by enabling the Link To RFx flag on the Copy Record window.
Along with the RFx, users also have the ability to select any associated documents (line items, questions, attachments, etc.) where the Allow Copy with Associations flag is enabled at the contract type level. By default, the flag is disabled, hence only the RFx is copied without its associations.
With this release:
- Sourcing events can be copied along with the selected associations such as line items, questions, questionnaires, suppliers, supplier contacts, internal and external attachments, and commitments.
- Some associations such as rounds, awarding, etc. may be configured to be excluded from being copied. These associations are not displayed in the Copy Record window.
- Automatic attachments will be excluded from being copied. These attachments are not displayed in the Copy Record window.
- Validations are provided to ensure supplier and related supplier contacts, questionnaire and related questions, are selected to be copied.
- Some RFx and associations’ attributes may be configured to be excluded from being copied. The attribute values will not be present in the copied RFx.
When copying the RFx:
- All or some user roles are copied in same or different role based on the configuration.
- The user who copies the RFx (based on user authorization) then becomes the primary owner of the respective RFx.
The changes can be viewed in the History audit log on the RFx Details page.
Note:
- Rule based users will not be copied to the new RFx.
- Based on the requirement, the configurator must check if the external users should be copied or not.
- This is applicable for RFx and RFI.
- Rule based users will not be copied to the new RFx.
Modify RFx Workflow
560526– Modification of an approved RFx until awarding is initiated
Buyers require a provision to add, remove or edit certain parts of the RFx, as all the required criteria or business requirements may not be available at a glance during the RFx creation.
With this release, ICI provides the ability to modify a RFx which is in Approved or later status until the awarding is initiated.
When RFx modification is initiated:
- The RFx status changes to In Modification.
- The status of rounds changes to On Hold (except rounds in Closed', Evaluation Started, Evaluation Closed statuses).
- Buyers can:
- Modify Line Items:
- Add line items for rounds in any status, except Closed or Evaluation related statuses.
- Edit line item attribute values for rounds in Draft or Waiting for Approval statuses, and for any round that might be created in future post RFx modification approval.
- Remove the line items through shortlisting. User can mark them as not selected for rounds in Draft and Waiting for Approval statuses, and for any round that might be created in future post RFx modification approval.
- Modify Supplier and Supplier Contacts:
- Add new suppliers for rounds in any status, except Closed and Evaluation related statuses.
- Add new supplier contacts to existing supplier for rounds in any status, except Closed and Evaluation related statuses.
- Remove supplier through shortlisting. User can mark them as not selected for rounds in Draft and Waiting for Approval statuses, and for any round that might be created in future post RFx modification approval.
- Modify Questionnaires
- Add new questionnaires for rounds in any status, except Closed and Evaluation related statuses.
- Add new questions to existing questionnaire for rounds in any status except Closed and Evaluation related statuses.
- Modify External Attachments:
- Buyer can add, edit and remove external attachments.
- When new attachments are added or existing attachments are modified, then the supplier will get the access once RFx modification is approved and at least one round is in Open status. However, suppliers will still have access to other attachments that have not been modified.
- Update Selective RFx Attributes:
- Buyers can selectively edit attributes, except those that have been configured by the administrator as non-editable.
- The attribute changes are displayed in the audit history. Note that, modifying selective attributes is a specific solution when RFx is In Modification status and is not a standard framework across the sourcing application.
- Enable or Disable Configuration Flags (Allow Line Item changes in RFx/ Allow Supplier Attachment changes in RFx/ Allow New Question/ Allow New Supplier During RFx Phase):
- Modify Line Items:
- Allow Line Item changes in RFx: If this flag is enabled, then buyers can add/edit line items through UI or Excel when RFx is in modification. If flag is disabled, then add/ edit will not be allowed when RFx is in modification.
- Allow New Supplier During RFx Phase/ Allow Supplier Attachment changes in RFx/ Allow New Question: If any of the flags is enabled, then buyers can make changes to supplier/ supplier attachment/ questions respectively when RFx is in modification. If the flag is disabled, then respective changes will not be allowed when RFx is in modification.
The supplier cannot take actions such as Submit, Recall Bid, and Decline RFx on bids.
For RFx modification approval, the administrator can configure rules to set the Approver. Approver can approve or reject the changes:
- If the buyer recalls the modification approval or approver rejects the changes, then RFx moves to the In Modification status.
- If the changes are approved, then the round and RFx status recalculation is done. For example, when RFx is in Bidding Open status, and round is in Open status, and buyer initiates modification, then the round will move to On Hold and RFx will move to In Modification status. When the buyer makes the required changes, and the changes are approved, then status recalculation is done based on round end date.
- If the round end date has passed, then round status will move to Closed and corresponding RFx status will move to Bidding Closed.
- If the round end date has not passed, then round status will move to Open, and corresponding RFx status will move to Bidding Open. In this case, the supplier will then be able to access bid and can perform actions such as Submit, Decline RFx and Recall Bid
When no Approver has been added, the RFx is auto-approved.
Note: The feature number # 560526 refers to the Modify RFx epic. The scope of the epic for this release includes features # 560560, 560575, 560576, 560578, 566708, 618441 and 620356 which are covered in these release notes.
RFx Evaluation Workflow
567274–Ability to evaluate and score suppliers based on bid submissions
Previously, buyers were not able to evaluate various suppliers in a round/RFx. They need a provision to evaluate suppliers on their bid submissions in response to the RFx as well as other capabilities (technical, commercial, tactical criteria). They can then provide objective scores and assign weightage that will help them not only in the awarding process, but also in selecting suppliers for future rounds.
With this release, buyers and administrators can conduct a review, and evaluators can score the supplier bids as well as provide feedback on the supplier submissions, contractual documents, etc. This is then consolidated and reviewed by the users which helps the event owner make an awarding decision based on the analysis.
Buyers can now:
- Create evaluation types: a mandatory text field. It includes a numeric Weightage field that can have a value between 0 to 100.
- Define evaluation criteria: a mandatory text field. The evaluation criteria data type and response type is added in the masterdata where criteria are created. It includes a Score field that can have a value between 0 and 100.
- Enable or disable evaluation in round: includes a flag Enable Evaluation in Round that is available when creating a RFx and a round. One the RFx or round is approved, this setting cannot be changed even when the RFx is in modification.
- Add evaluation type and evaluation criteria to the round allows user to select any number of evaluation criteria in each evaluation type. Changes can be made anytime till the evaluation starts.
- Add users or a team as evaluators: allows creation of user groups of ICI users. A user can be part of multiple groups, and at least one user must be present in each group.
- View different statuses during evaluation process: includes statuses such as Evaluation Started andEvaluation Closed.
- Close the Evaluation: evaluation type and evaluation criteria per supplier are closed, and gives a consolidated view to buyers/administrators for analyzing ratings given by evaluators.
Assigned evaluators will now:
- Receive notification about the evaluation that needs to be performed.
- View evaluation type and evaluation criteria assigned to them.
- Perform an evaluation and submit the ratings.
The Start Evaluation button will be available only after the round is closed.
Multi-Currency Support
- Configure the corporate currency in the currency master:
- Add currencies to the currency masterdata that contains a list of currencies that can be used in an RFx event.
- Manage currencies from the currency master by adding new currency and currency symbol.
- Set a single currency as a corporate currency for the organization to be used in Sourcing reporting.
- Restrict the option to delete the currency and only allow making it inactive. Note that every currency added to the currency master must have a validity period that allows using currencies in different entities.
- Configure the exchange rate of different currencies:
- Add, remove or edit the exchange rates in the currency masterdata. The specified currency exchange rate must have a defined validity period.
- Set currency exchange rates for supported currencies. Note that duplication of exchange rates for same currency and same validation is not allowed.
- Select the primary and allowed currency for the RFx:
- Select one currency as the RFx primary currency which is selected from the list of currencies available in the currency master including the expired currencies. Buyers can also select multiple currencies to be allowed in the RFx. It is mandatory to select a primary and allowed currency for the RFx that will be used in bid analysis excel sheet to convert bid currency to RFx primary currency.
- Select the primary and allowed currency that can be used by the supplier to bid for the RFx.
- Restrict editing the currency attributes used in RFx other than the one that is set as RFx primary currency. When RFx primary currency is updated, ICI uses the currency for all other currency attributes automatically, until the RFx is in Draft state.The activities performed by the buyer relevant to the currency selected for an RFx are logged in the RFx History.
- Select currencies from list of allowed currencies:
- Allowed currencies for RFx can be used as the bid currency.
- All currency attributes for a line item are restricted to the RFx currency.
- The modified allowed currencies for RFx are displayed to suppliers as bid currencies for all items.
- Configure the exchange rate of different currencies for the RFx:
- Specify the exchange rates that can be used in the RFx.
- Specify if the applicable exchange rate is based on round start and end date and user selected date.
- View the applicable exchange rate for the RFx and the history of the exchange rate specified for the selected RFx. Note that the applicable RFx exchange rate is available to both the buyers and suppliers.
- Download the bid analysis excel at any time that includes all bids from all suppliers for all rounds along with the bid currency and RFx primary currency. The bid analysis file contains details such as line items, bids, and so on. You can download the bid analysis at RFx, Round, Bid level in the Sourcing lifecycle.
- Use conversion rates in bid analysis Excel:
- Buyers can now:
- Download the bid analysis Excel file that allows to view all the bids received from multiple suppliers.
- Download the flexible bid analysis Excel file for each round after it is closed that allows viewing bids received and converted to RFx primary currency. This file contains information for specific rounds only.
- Buyers can take the following actions when the bid is created:
- Select the bid currency that allows submitting surrogate bid on behalf of the supplier.
- View the changes made to the bid that are logged in RFx History.
- Suppliers can take the following actions when bidding in multiple currencies:
- View the supported currencies for RFx that allows viewing the applicable exchange rates.
- Select the currency from the list of quote currency that allows submitting the bid in the selected currency.
- Submit the bids for items in selected currencies.
- Upload or download the bidding template that allows adding bid information in excel sheet and upload to ICI.
- Update the bid currency using ICI and Microsoft Excel
- Buyers can take the following actions when updating the awarding object for the RFx using multiple currencies:
- Download the awarding decision template that will allow awarding the desired suppliers and upload the awarding decision.
- Include the bid currency in the awarding decision that allows including the bid currency and other bid information in the contract.
- Buyers can now:
Note: The feature number # 567584 refers to the Multi-Currency Support epic. The scope of this epic for this release includes features # 567585, 567586, 567587, 567588, 567589, 567590, 567591 and 567593 which are covered in these release notes.
Sourcing Application Enhancements
571048–Supplier contact management UI improvements
Previously, when selecting a supplier contact, only the first name of the supplier contact was displayed.
With this release:
- The Supplier Contacts window user interface has been improved.
- The name of existing Supplier Contact Name column has been modified to Supplier Contact Full Name. For example, Tom Sibley instead of Tom.
- Buyers can remove a supplier contact from the Supplier Contact page. This updates the count of selected supplier contacts.
- The selected supplier contact’s full name is displayed on the new selected supplier contacts interface.
- The suppliers and supplier contacts saved earlier are now pre-selected when adding more suppliers and supplier contacts.
The supplier contact full name column will be displayed by default on the supplier contact selection page, supplier contact details page and grid view of the supplier contact association.
This makes it is easier for buyers and administrators to identify and select the correct supplier if there are multiple suppliers with the same first name.
Note: This is applicable for RFx, RFI, Rounds and Bulk Agreements.
- The file names will be the same as the left navigation pane when downloading or uploading them to ICI.
- The files will be downloaded as per the defined folder structure and folder naming conventions which helps users to easily identify files under individual folders of the RFx and avoid any discrepancies.
- If the files names are duplicated, then they are handled by appending a numeric value to the file name.
Note: This is applicable to both RFx and RFI.
568737– Ability to link existing supplier contracts for prerequisite, mandatory and associated contracts
Previously, linking existing supplier contracts with the RFx was not possible. This created duplication of contracts and the user had to go through the complete contract lifecycle again.
With this release, an enhancement has been made to allow linking existing RFx supplier contracts for all prerequisite, mandatory and associated contracts.
Buyers can now:
- Link existing supplier contracts (prerequisite, mandatory or associated contracts) allowing buyers to leverage existing contracts with suppliers.
- View the contracts of the supplier when creating the bulk agreement that allows assigning any supplier contact as a signatory for the agreement.
- View the signatory of the prerequisite contracts that allows the suppliers to connect with the signatory if the contracts are not executed.
- Send the agreements for approval in bulk that helps avoiding sending the agreements for approval individually.
- Select the new signature type Click to Sign allowing suppliers to participate in the sourcing event by previewing, accepting or declining the contractual terms set by the buyer.
573435/573436– Ability to add bulk line items to RFx to address large volume of sourcing data
The bulk associations capability has enabled ICI to handle a large number of associations to the tune of thousands, by presenting itself as a lightweight association as well as tremendously improving performance. The Sourcing event can include many line items for an RFx ranging from 500 to 50,000 maximum. In Sourcing, line items are considered as associations.
The bulk association configuration has now been simplified by providing aEnable Bulk Processing flag at contract type definition level which triggers a set of defaults that has been intentionally restricted. The end user experience for the bulk association has not changed from the way that the conventional association is handled from the UI, rather the underlying data structure has been further enhanced to make it go the distance.
Bulk association is enhanced to be able to address the large volume of data that Sourcing apps require. These enhancements include:
- The associations not having a workflow.
- Simplifying the association team by maintaining single team at proxy level for all instances, instead of each instance having its own team.
- Restricting document assembly, for individual instances, but the instances can be assembled in the parent agreement as a table or saved search.
- Reducing the attributes to be indexed in the parent, so as to cater a greater number of instances driven by the configuration key.
Note: Please refer to the Technical Design Document for more details.
566709–Addition of validations for shortlisted suppliers
Previously, validations for prerequisite and mandatory contracts appeared for all suppliers even if they were not shortlisted in the RFx.
Now, buyers will be able to view the validations for the prerequisite and mandatory contracts for the shortlisted suppliers only. For a shortlisted supplier, if all the prerequisite contracts are inactive, or if any one of the contracts is active but not in Approved or later state, then the validations will be displayed. For example, if there is one shortlisted supplier with two prerequisite contracts NDA 1 (in Draft state) and NDA 2 (in Waiting for Approval state), then validations will be displayed.
The validations will not be displayed for shortlisted suppliers when at least one active prerequisite contract exists, and all such contracts are in Approved or later state. For example, if there is one shortlisted supplier with two prerequisite contracts NDA 1 (in Approved state) and NDA 2 (in Expired state), no validations will be displayed since one of the two prerequisite contracts (NDA 1) is in Approved or later state.
404532–Editing round start and end dates in different states
Previously, when the round was scheduled or open, buyers could not change the round start and end dates. However, in Sourcing, timelines often change for various criteria, internal or external.
With this release, buyers can now edit the round start and end date when the round is in Draft, Waiting for Approval, On Hold, Open or Approved statuses.
You can make changes only to the round end date when the round is in Open state. The changes made to the round start and end date are captured in the History on round Details page.
This does not impact an ongoing round and suppliers can continue to bid. If configured, all the team members (buyers or suppliers) who are on the round receive a notification when the change is made.
627740–Flexibility to use non-seeded masterdata for supplier and supplier contacts
Previously, to add supplier contacts, the buyer could select them from a list of supplier and supplier contacts in the Supplier window. This list of contacts belonged to a particular seeded masterdata contract type. Many customers have their own masterdata contract type for maintaining supplier and supplier contacts.
With this release, buyers can use any supplier and supplier contact masterdata contract type to add suppliers, whereas seeded attributes such as ICMAppSrcGlobalSupplierCode and ICMAppSrcSupplierContactEmailID are mandatory and should be a part of the custom contract types.
Note: This is applicable to RFx and RFI.
Sourcing Reports
576084–Inclusion of the RFx Change History Report for a consolidated view of all actions of an entity
Previously, the Sourcing application provided the change history of rounds, bids and awarding separately for rounds and bids within the RFx.
With this release, the Change History Report has been introduced, which provides a consolidated view of all actions for entity. This will help the procurement team to view the entire history of rounds, bids and awarding within a RFx, at a glance for auditing purposes. This report is accessible only to buyers (not suppliers), from within a RFx transaction, hence only authorized users with access to a RFx can view this report. All the latest updated information captured at the point of time when the report is generated will be displayed in it.
The Change History Report can be generated by applying the following filters - Entity Type, User Name, User Role and Supplier Name. By default, the report is filtered on Entity Type as RFx/RFI. Based on the requirement, users can change filters. The report provides details with columns such as Date & Time, Event, Entity Type, Entity Name, User Name, User Email, User Role, Supplier Name, Notes, Attribute Name, Previous Value and New Value.
Note:
- This applies to RFx and RFI.
- If the RFx is in Pre-Draft state the No Data Found message is displayed.
573599– Enhancements to Sourcing Reports
The RFx Summary Report and RFx Details Report provide a consolidated view of data for RFx with various categorizations, thus providing the visibility to top management on sourcing activities and helping them to take more informed decisions.
With this release:
- The RFx Summary Report now displays:
- Sorting capability on RFx Information and Supplier Information columns.
- The name of column Submitted 'Statusis changed to Bidding '''Status and the name Submission Dateis now changed to Bidding Status Update Date.
- The RFx Details Report now displays:
- The RFx status displayed asBidding Closed, Bidding Scheduled, Bidding Open in conjunction with the revamped RFx workflow.
- The Bidding Details (within RFx Details Report) displays:
- Supplier View: Supplier ID, Supplier Name, Round Name, Shortlisted status.
- Round View: Round Name, Supplier ID, Supplier Name, Shortlisted status.
- Line item View: Line Item Name, Round Name.
- The Supplier Information section (in RFx Summary, RFx Details Report) displays contracts such as NDA, MSA, and so on. The contract names will now also display the classification such as prerequisite, mandatory or associate for ease of use. For example, if Warranty Agreement is added as a prerequisite contract, then it will be displayed as Warranty Agreement (Prerequisite).
- TheBidding Details Report now includes:
- Quote Currency column next to Quantity, that displays currency specified by supplier for each line item while bidding for a round.
- For Sealed Bid, Bidding Details will be visible only when the round is inOpen, On Hold, Closed, Evaluation Started orEvaluation Closed status. The round details are not displayed otherwise. For non-submitted bids, submission status will be Not Submitted and Closed.
- For bids with statusesDraft or Submitted, NA or a blank screen will be displayed for SupplierQuote Currency, Base Price and TotalPrice.
- For bids with statusesNot Submitted and Closed, Submitted and Closed, the actual value will be displayed for Supplier Quote Currency, Base Price andTotal Price.
- When the round is in On Hold status, bid object may or may not exist. If bid object exists, then entry will be displayed in bidding details. Otherwise, no entry will be displayed.
- When round will be in Closed, Evaluation Started, Evaluation Closed status and when bidding status will be Declined, then actual value will be displayed for Supplier Quote Currency, Base Price and Total Price.
- When round will be in On Hold or Open status, and bidding will be in Declined status, then NA or a blank screen will be displayed for Supplier Quote Currency, Base Price and Total Price.
- For OpenRFx, Bidding Details will be visible when the round is in Open, On Hold, Closed, Evaluation Started or Evaluation Closed status. The round details are not displayed otherwise.
- When the bid is Surrogate, then the actual values will be displayed for Supplier Quote Currency, Base Price and Total Price. Also, to highlight that the bid is surrogated, the Bidding Status column will be marked with * symbol. For example, Submitted *
- For the bid in Draft status, NA or a blank screen will be displayed for Supplier Quote Currency, Base Price andTotal Price.
- When the bid will be in Not Submitted and Closed, Declined, Submitted, Submitted and Closed status, then actual values will be displayed for Supplier Quote Currency, Base Price andTotal Price.
- When the round will be On Hold status, bid object may or may not exist. If bid object exists, then entry will be displayed in bidding details. Otherwise, no entry will be displayed.
- Quote Currency column next to Quantity, that displays currency specified by supplier for each line item while bidding for a round.
Frequently Asked Questions
'1. 'Does the new RFx workflow support customization?
Yes, the new Sourcing workflow supports customization by making use of business status. Using technical configuration, customers can implement business status as desired to suit their requirements.
2. For customers using older version of Sourcing, do we support migration to the new workflow?
During upgrade process, existing data shall be migrated to ensure that legacy data uses the new workflow. However, rules that were created previously using older workflow status will have to be reconfigured manually.
3. ''''Can a supplier choose to participate in RFx after declining the RFx?
Once the supplier has declined RFx, the supplier exits the RFx and shall not be able to participate unless added to the RFx explicitly by the buyer.
4. ''''When using Copy RFx function, can I exclude and include a few attributes?
While copying RFx, all attributes of the RFx and its associations are copied. However, few attributes can be configured for exclusion. If configured, then values of such attributes are not copied in RFx and its association.
5. ''''When copying an RFx, what does “Link to RFx” do?
If Link to RFx is set to Yes, it links the copied RFx to the source RFx. By default, this is set to No. In this case, the copied RFx will not be linked to the source RFx.
6. ''''Is approval mandatory when modifying RFx? Can I skip the approval process?
It is recommended to get RFx modifications approved. However, RFx modification approval can be skipped if approver is not configured.
7. When RFx is in modification, what actions are permitted? Can I add suppliers, items, etc.?
When RFx is in modification, buyers can add/ shortlist suppliers, add questionnaires, add/ update/ shortlist line items, and add/ update/ remove external attachments.
8. ''''Can I perform RFx evaluation at RFx level?
No, you cannot do evaluation at RFx level, although you can create the evaluation in a round that has all the suppliers participating in the RFx and keep the evaluation open till all rounds are closed. Hence, the evaluation will be done once and could be treated as RFx level evaluation.
9. Is it necessary to do RFx evaluation for each round?
No, you can choose before creating a round whether you want to enable evaluation in that round or not. Please note the Enable Evaluation flag cannot be modified using RFX modification.
'10. 'How can I use scores and weightages in RFx evaluation?
While setting up the evaluation, you may assign weightages and while evaluating you can provide scores while final evaluation you may download the evaluation sheet and use these scores and weightages to get the weighted scores.
11. ''''What are the nuances of evaluator role?
Evaluator is a new role. The evaluator has to be a provisioned user, who has limited access over the entities in the RFX and round, and can assign his role to someone else.
'12. 'How can I invite different team members to different parts of evaluation?
After adding the evaluation type, you need to select the evaluators which could be a team too though they all work on the same instance.
Note: You may have same or different evaluators for different evaluation types.
13. 'I want to perform a bid analysis for every bid received for all or one supplier at a time? How can I do this'?
To do bid analysis for every single bid received in the RFx, you can use the Flexible Bid Analysis feature. Select the attributes that you want to use for bid evaluation at the time of creating an Item. As a buyer, you can enter values for each bid evaluation attribute. Thus, you can perform a bid evaluation.
14. Can I add more extension attributes after RFx is approved?
Currently, adding more extension attributes after RFx is approved is not supported. It is recommended to use all the extension attributes that are intended to be used before the RFx is approved.
15. After initiating award, how can I create another round of RFx'?
After awarding is initiated, new rounds cannot be created. To create new round after initiating awarding, buyer has to delete the awarding object and then create new round the way it is normally done.
16. For customers using older version of Sourcing, do we support migration for currency?
At the time of migration, system will ensure that currency of existing RFx data is set to the organization currency. Allowed currencies is set to all currencies used in the RFx automatically. Post migration, currencies of existing RFx can be changed depending on the status of the RFx.
17. What happens if no exchange rates are available for any currency?
If exchange rate is not available for a currency, conversion to RFx primary currency or organization currency does not happen. Once exchange rate is set, conversion to RFx primary currency shall happen.
18. Can I modify exchange rate of currencies?
Exchange rate of currencies with current and future validity can be edited. Exchange rate records of the past cannot be changed. New exchange rates shall apply when bid analysis is done thereafter.
ICI Risk Management Release Notes
Overview of Risk Management
The Icertis Contract Intelligence (ICI) platform introduces the Risk Management Application to make it easier for professionals to carry out their tasks related to risk management such as assessment, due diligence, remediation, monitoring and reassessment. Risk management is the process of identifying the potential risk, assessing the magnitude of risk based on the business objectives, devising strategies to mitigate them and tracking the performance until they are completely mitigated.
The platform’s modern, scalable and integration-friendly cloud architecture can model even the most complex risk management scenarios. The App provides secure access such that only authorized users can access the App entities and data, using the ICI’s access control functionalities such as role action mapping. The user-friendly interface makes it possible for anyone in the enterprise having access to be able to use the platform with ease. Icertis uses a standard framework for risk management of discovery, assessment, remediation, monitoring and optimization to manage enterprise risk.
The Risk Management process includes:
- Configure and Setup: Configure contract types for risk assessment and the risk area (with its workflow). Also, configure the masterdata that captures risk area, risk taxonomy and risk score matrix to effectively govern the risk management process. Set up the risk area, questionnaire, and risk evaluation criteria.
- Discover: Rules engine can be used to discover potential risk areas and its magnitude based on responses to the questions.
- Assess: Validate if the risk areas being identified are valid or not. If valid, check whether any further information needed as part of due diligence.
- Remediation: Based on risk area and its magnitude, Risk Owner creates tasks to mitigate risks.
- Monitor and Optimize: Track the performance of risk and measure risk remediation effectiveness. If ineffective, system performs optimization by allowing Risk Owner to devise other remediation tasks.
ICI Risk Management supports the following risk management business scenarios:
- Business Operations: For example, the impact of pandemic on the business operations of an organization.
- Contractual: For example, managing risks that arise from non-standard agreement terms, clauses, and so on.
- Counter Party: For example, managing risks relevant to suppliers and vendors.
The Challenge
Business risk can emerge from any division of a company and must be managed proactively to avoid devastating impacts. Often, these risks originate in the contracts of an organization, with an external party or because of the business and regulatory environment in which the entity operates.
As contract are the single source of truth, it is imperative to have enterprise wide risk insights that will help organizations maximize value and minimize risks.
The challenges faced by organizations today include:
- In the post-pandemic world, organizations are becoming more vigilant about handling risks proactively, and managing business continuity and disaster recovery. However, the current approach is reactive and not proactive.
- Traditional Governance, Risk and Compliance (GRC) tools are not able to roll-up enterprise-wide risk insights from contracts which are the single source of truth. As a result, they are only good at reporting and analyzing risk in hindsight.
- The current process is mostly manual; only about 12-24% is automated. As a result, organizations have inadequate visibility and into contractual obligations which can lead to substantial risks if not surfaced at the appropriate time and monitored at an adequate level to provide required executive attention.
The Solution
Built on the Icertis Contract Intelligence (ICI) platform, the ICI Risk Management App brings a paradigm shift in the management of business risks. The App offers a process- oriented enterprise-wide solution to stay on top of all potential risks that a business faces – whether they emanate from the potential insolvency of a counter-party, payment default by a customer, supply disruption due to a pandemic or natural disaster, logistics blockades due to localized conflicts, or other market turbulence.
With the Risk Management App, companies can:
- Perform risk discovery, assessment, remediation, monitoring and optimization in any business context that is relevant to a specific organization. For example, supplier risk assessment at the time of onboarding a supplier, customer credit risk check while signing long-term contracts on non-cash terms, contractual performance risk while evaluating technical capabilities of a service provider, etc.
- Prevent and reduce risk-injection as opposed to only managing risks.
The Capabilities
The intelligent and easy-to-use ICI Risk Management App offers these powerful capabilities:
- Risk Area and Scoring Model Configurability:
- A configurable risk area to gauge contract, counter party and operations risk at various levels of business granularity.
- An easy-to-configure platform that helps to set up a quantitative and qualitative risk score model to meet business needs.
- Questionnaire-based Risk Identification:
- In-App questionnaires to discover all vendor or business operation risks based on responses.
- Auditing:
- Audit trails of every action with user and time-stamp details.
- Alerts and Notifications:
- In-built notifications to inform risk owner about changes in risk area status.
- In-built notifications to inform risk owner about changes in risk area status.
The Benefits
- Effective risk monitoring reduces the impact of operational, financial and reputational risk, contributing significantly to the company’s bottom line.
- Configurable system can conform to any risk model in the world and even develop industry - and company-specific risk models with no custom code required, thereby greatly reducing deployment costs.
The Risk Management Process
Configuring the Risk Management App
Working with Risk Assessment Contract Type
Working with Risk Area Associations Contract Type
Frequently Asked Questions
1. Is the ICI Risk Management tile name configurable?
Yes, the Risk Management tile name is configurable.
2. Is the App available on smartphone as a mobile App?
No, the App is currently not supported on mobile App.
3. Can risk assessment or risk area be previewed as PDF?
No, PDF Preview is currently not supported.
4. Is localization supported by the App?
Yes, the App has localization support for all languages supported in ICI.
5. Can the App be used to manage tasks in third party systems?
For identified risk area, the Risk Owner can manage mitigation tasks with integration to third party systems.
6. Is there a way to manage historical risks?
The App allows importing historical and ongoing risk assessments from customer systems to ICI.
7. Can I view a list of active risk area?
Yes, a list of active risk areas and risk assessments can be monitored.
8. Is a report generated for risk management tasks?
Yes, the Risk Owner can view a status of any risk remediation task and get notifications for overdue tasks.
9. Are audit logs available in the App?
Yes, audit trails of every action with user and time-stamp details are available.
Glossary
- Risk Area: It is the exposure that an organization has from internal or external factor(s) that impacts the normal functioning of business and will lower its bottom line (or profits) or lead it to fail. For example, cyber security risk.
- Inherent Risk: It is a risk indicator. It is the starting score for each identified risk area and is expected to be controlled.
- Residual Risk: It is a risk indicator. It is the score that depicts the risk remaining once mitigation actions have been planned and implemented.
- Assessment: Risk owner determines or assesses whether identified risk area is valid or not. Likewise, Risk owner can add risk area manually.
- Due Diligence: It is a complete review of risk aea. As part of incomplete or missing information, tasks may be created to gather information.
- Remediation: These are strategies created to mitigate risks. For example, Avoid strategy, Transfer Strategy, Reduce Strategy etc. Based on remediation strategy, mitigation tasks are initiated.
- Monitoring: It refers to the system tracking the progress of risks mitigations.
- Risk Taxonomy: It is comprehensive set of risk categories and sub-categories used in an organization. It outlines as approach to categorize and aggregate all types of risks that could affect the organization's objectives.
- Likelihood Rating: On a risk matrix, it represents the likelihood (level of probability) of risk occurrence.
- Consequence Rating: On a risk matrix, it represents the magnitude (level of impact) of risk occurrence.
- Risk Score Matrix: It is a matrix that uses a combination of likelihood and consequence rating to determine magnitude of risk.
- Risk Level: It is the qualitatitive score for every risk area transaction.
- Risk Score: It is the quantitative score for every risk area transaction.
- Control Effectiveness Rating: It represents the effectiveness of all the controls that act upon a particular risk. This includes those controls that affect the likelihood of the risk and those that affect the consequencesrisk remediation actions taken to mitigate risk.
Technical Requirements for Release 7.12